10 months in the past I have had no problems using this company. The panel and inverter installation method went pretty efficiently. No roof tiles were damaged. The entire installation took about three hrs. So far, I am incredibly happy with the merchandise used. 2 months back Daniel was extremely https://citypointsolar.com.au/4-factors-to-consider-when-installing-solar/