1

Advanced 400 kW Chiller Installation Secures Fifty Thousand Pounds Annual Cost Reduction on Energy and 200 Tonnes CO₂ Reduction

News Discuss 
Project Highlight Newsome has successfully delivered the installation and commissioning of a modern 400 kW chiller at a major confectionery manufacturing site in York. Designed to reinforce ESG targets, the installation boosts process efficiency while lowering overall power consumption and CO₂ levels. https://bookmarkblast.com/story20783782/energy-efficient-400-kw-chiller-installation-delivers-50-000-yearly-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-cut

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story