PIK2 started construction in 2016 based on TOWNLAND’s renewed Learn Prepare on this Beforehand swampy and low yielding agricultural land. This was followed by building of the main ring street community as the key backbone with the Township’s circulation program and subsequently the canal system. Thus far (mid-2021), PIK 2 https://www.propanraya.com/propan-sandimas-experience-center-hadir-di-pik-2-tawarkan-inovasi-terbaik-untuk-solusi-cat-dan-pelapis